ColumbusConcrete Driveway
Wide new concrete driveway meeting the public sidewalk in front of a two-car garage

Franklin County ยท Free Quote

Concrete Driveways in Hilliard, OH

Concrete driveways, aprons and garage slabs in Hilliard. Send the size for a free quote.

Columbus, Dublin, Hilliard, Westerville, Gahanna, Grove City, Reynoldsburg and 25 more towns

Hilliard Driveway Quote

Add the approximate length and width, what is there now and what will park on it. You get a call back to cover the details and book a measurement.

  • Free driveway quotes
  • 4 to 6 inch slabs
  • Compacted stone base
  • Steel on chairs

Approximate dimensions are fine. Quotes are free. ๐Ÿ‘‡

Rather talk? Call (614) 957-1021

Hilliard, Ohio

Driveway specs for Hilliard properties

Whether a Hilliard property needs its first concrete driveway, a replacement for a cracked one or another 10 feet of width for a third car, the quote starts with measurements. Length, width, current surface and what parks on it are enough to begin.

Newer subdivisions around Columbus often have backfill along the garage that settles for years, so the first panels out from the garage door get extra compaction or stone. Central Ohio's clay subgrade swells when wet and shrinks when dry, so driveways here typically sit on 4 to 6 inches of compacted crushed stone that drains and spreads the load evenly.

To start a free quote in Hilliard, call or send the form with the driveway's rough length and width, what is there now and what will park on it. A call back follows to go over the spec and set a time to measure.

Concrete driveway climbing gently to a white two-car garage door on a suburban home

Franklin County, Ohio

Around Hilliard

On the streets around Hilliard Municipal Park, VZW Park and Hayden Run, Hilliard driveways come in every length and slope, and each quote begins the same way: measure it, check the drainage, set the thickness.

Garage footings and other structural concrete need to bottom out under the frost line, roughly 32 inches deep in this part of Ohio; a driveway slab floats on its stone base above that depth.

Driveway owners just outside Hilliard, in Upper Arlington, Dublin, Lincoln Village and Marble Cliff, get the same spec-first quote at no charge.

Examples

Driveway slabs, joints and finishes

  • Wide new concrete driveway and front walk before a single-story home with a white garage
  • Long straight concrete driveway with control joints leading to a detached double garage
  • Broad exposed aggregate concrete driveway with sawed joints leading to a double garage

Example photos of the type of work.

Questions

Hilliard questions

How many days until a new Hilliard driveway can take a car?

Walk on it after 1 to 2 days and drive on it after about 7 days. Heavy trucks should wait longer, and cool weather slows curing. The slab reaches its design strength at about 28 days.

How thick should a driveway in Hilliard be?

Typically 4 inches for cars and SUVs and 5 to 6 inches where trucks, trailers or campers park, with thickened edges. The base under it, usually 4 to 6 inches of compacted stone, matters as much as the concrete.

Do I need a permit for a driveway in Hilliard?

The apron in the public right-of-way usually needs a permit, issued by whichever city, village or township controls that street, each with its own process. Work entirely on your lot may not, but HOA rules can still apply. The permit question is settled before any excavation.

When is the best time to pour a driveway in Hilliard?

Spring through fall, when nights stay above freezing and the ground is workable. Late-season pours can go ahead with blankets and cold-weather practices, but never on frozen ground. Summer heat calls for early starts and a careful cure.

How do I get a driveway quote in Hilliard?

Phone (614) 957-1021 or use the form to send the driveway's approximate size, what is there now and what will park on it. The contractor calls back to discuss it and book a time to measure, and the quote is free.

How long does a new driveway take from start to parking?

A typical residential driveway takes about 2 to 4 working days of site work: tear-out or excavation, base and forms, then the pour and joint cutting. Add about 7 days of curing before cars. Pours run mostly spring through fall, and late-season work relies on blankets and cold-weather practices.

Send the dimensions, get the spec and the quote

Length, width, what parks on it and what is there now are enough to start a free driveway quote.